Hybrid solar power station, 10 kW. - Energy OneHybrid solar power station, 10 kW. - Energy One

Hybrid solar power station, 10 kW.

10
2021
Makariv region

Construction of a turnkey hybrid solar power station has been completed in the Makariv district, Kyiv region.

The client approached us with the issue of frequent power outages in their home, as well as unstable voltage at the entrance to the house. An audit of the facility revealed and confirmed the client’s needs. After discussing 8 equipment options and project implementations, we came to the following solution – to install a solar power station with a capacity of 10 kW.

The peculiarity of this project is that the station operates within a cooperative where it is not possible to enter into an agreement with the Kyiv Regional Energy Company and DTEK Kyivoblenergo for the purchase and sale of electricity at the “green” tariff for a private household. Considering this, we held several meetings with the cooperative management, proposing to organize the offset of consumed and generated electricity for the client’s home. The replacement of the meter with a bidirectional one was carried out by the cooperative staff. As a result, the client gained the opportunity to return excess electricity to the cooperative under certain conditions and use the transferred kWh for their needs in the winter.

Main equipment of the power station:

– 39 Photovoltaic modules produced by the world leader Ja Solar at 320W each (12.5 kW).
– Hybrid inverter produced by Solis – 10 kW with Wi-Fi monitoring.
– PylonTech HV 9.6 kWh battery with a voltage of 192V.
– Protective equipment produced by ETI.
– Aluminum mounting system – Spline Systems.

The projected annual generation of the system is 12,000 kWh.

The station paid off on the day when the electricity disappeared from the grid.

Other Projects

Solar irrigation system 70 kW.

45\70 kW
2023
Kyiv region
Work list:
Design. Equipment supply. Installation. Commissioning.

Ground-mounted solar power station, 43 kW.

30
2021
Kyiv Oblast, Pereyaslav-Khmelnytskyi district.
Work list:
equipment supply, installation, setting up "green" tariff, commissioning for commercial operation.

Ground-mounted solar power station, 88 kW.

88
2022
Village Zazymye, Brovary district
Work list:
Project, equipment supply, installation, setting up "green" tariff, commissioning for commercial operation.

Contact us

Address:

Ukraine, Kyiv, Prospekt Sobornosti, 19

Show on map
Work schedule:

Mon. - Sat: 9am to 7pm
Sun: Outgoing

Social links:
Your name
Ваше email
Phone number
Your question

Fill in the required fields

Submit
Wait...